Pile Repair

Back to other case studies

Pile Repair

This front of this sleepout needed repiling urgently due to gradual water damage.

After repiling the front of the sleepout, we installed drainage to prevent the same problem from reoccurring in the future.

The first two photos are 'before' photos.

Click on the thumbnails for full-size images


 
© 2019 GJ Lester | Site map | Search | Terms & Conditions Powered by Rainbow Creative | 21 Sep 2019
Admin